Case Study: Erscon Canada Inc.
COMPANY: Erscon Canada Inc.
LOCATION: Edmonton, Alberta, Canada
PROJECT SITE: Wolf Willow Ridge in the North Saskatchewan River Valley
EB MODELS UTILIZED: EB-70
PROJECT/CHALLENGES: The project included slope stabilization and revegetation on three slide areas directly behind a housing development. Access to two of the three slides was severely limited. The access road shown on the first photo at right wasn’t passable, so the Express Blower truck had to be parked on the street in front of the homes with the blower hose running between homes in order to reach the slopes. Due to the extreme nature of the slides, netting was put down, then filter sock was incrementally staked across the slopes, and the blanket was applied over and between those to help aid in permanent slope stabilization. Project also included planting tree plugs over the slopes.
PRODUCTS APPLIED: 3-inch EcoBlanket® and 8-inch & 12-inch Filtersoxx™.
QUANTITIES/DISTANCE: Project included 1800 yards of blanket, 2746 feet of 8” sock and 239 feet of 12” sock.
COMPANY PROFILE: Erscon Canada Inc. is committed to promote sustainable erosion and sediment control practices by utilizing recycled organics as the building block for their products, principles, and services in order to create healthy soils and protect waterways.
View Slide Show -->
The slide show includes photos not shown to the right.
Opportunity Knocks
See the EB Advantage
Find out the Profit Potential
|